5250 Yonge is a high-rise development for office and retail space in North York with 31 storeys and 4 levels of underground parking. The site is bounded by Yonge Street to the east, with the TTC Yonge-University subway line.

Location:
Southwest corner of Yonge Street and Ellerslie Avenue, North York, Ontario

Duration:
2019 – 2020

Shoring Contractor:
GFL

Services Provided

InGeo Design was engaged by G Group Development Corporation to deliver excavation shoring design and monitoring services for a 31-storey mixed-use tower located at the southwest corner of Yonge Street and Ellerslie Avenue. The development includes four levels of underground parking constructed directly adjacent to the active TTC subway tunnel.

InGeo developed a soldier pile and lagging system supported by tiebacks and corner braces to support the deep excavation. Given the proximity to sensitive TTC infrastructure, our team conducted a detailed Finite Element Analysis (FEA) to assess the effect of excavation on the subway tunnel, ensuring compliance with TTC developer submission requirements.

We supported the client through the PUCC (Public Utilities Coordination Committee) circulation process and implemented a monitoring program. With fast, coordinated delivery of designs and direct access to experienced engineers, InGeo enabled safe excavation.

Key Challenges

  • Excavation adjacent to active TTC subway tunnel
  • Meeting TTC developer submission and monitoring requirements
  • Deep excavation with complex corner conditions
  • Coordination with multiple regulatory stakeholders including PUCC

InGeo’s Role & Scope

  • Design of soldier pile and lagging shoring system with tiebacks and corner braces
  • Finite Element Analysis to model excavation impacts on TTC subway tunnel
  • Support for PUCC utility circulation and permitting
  • Installation and monitoring of precision targets inside the subway tunnel
  • Full monitoring package including pile, precision, inclinometer, and vibration monitoring
  • Pre-construction condition surveys were done all around the site

More Projects

Union Station

Complex Excavation Support & Tunnel Rehabilitation:
Front Street Corridor – Toronto, ON... Read More

seawall; sheet piles; shoring; toronto islands

Royal Canadian Yacht Club Seawall

Seawall and Boat Lift Replacement for Expanded Marine Access
Royal Canadian Yacht Club – Toronto Islands, Toronto, ON... Read More

excavation; shoring; design; highway

Essa Road Expansion

Excavation Shoring for Interchange Reconstruction and Bridge Replacement
Highway 400 & Essa Road – Barrie, ON... Read More

Highway 407 Expansion Over Wilcot Creek

Excavation Shoring for Bridge Construction on Major Highway Expansion
Highway 407 at Wilcot Creek – Clarington, ON... Read More

West Portal - Eglinton Crosstown LRT

Excavation Shoring & Monitoring for Major Transit Infrastructure
Eglinton Avenue West – West of Black Creek Drive, Toronto, ON... Read More

Dundas And Aukland Condominium

Urban Excavation Shoring & Monitoring for High-Rise Mixed-Use Tower
5249 Dundas Street West – Etobicoke, ON... Read More

2175 Keele Street Phase II

Excavation Shoring & Monitoring for Large-Scale Mid-Rise Residential Development
2175 Keele Street – Toronto, ON...Read More

Excavation; Shoring; Design

Queen & Ontario Condominium

Excavation Shoring for Mixed-Use Towers with Heritage Sensitivity
261–285 Queen St. E., 90 Ontario St. & 384–410 Richmond St. E. – Toronto, ON... Read More
Excavation; Shoring

Toronto Western Hospital

Excavation & Monitoring Support Design for Hospital Expansion: Bathurst Street & Nassau Street – Toronto, ON... Read More

excavation; micropiles; bridge; shoring; design

Catharine Street Pedestrian Bridge

Specialized Foundation Design & Load Testing for Municipal Bridge Replacement
1 Catharine Street, Belleville, ON... Read More

Dofasco Steel Plant Micropiles

Micropile Design & Testing for Major Industrial Expansion
1330 Burlington Street East – Hamilton, ON... Read More

shoring, excavation

900 St. Clair Avenue West

Urban Excavation Shoring & Monitoring for Mixed-Use Development
898–900 St. Clair Avenue West, Toronto, ON... Read More

excavation; shoring; design; support

Beckett Sproule Pumping Station

Shoring Design and Monitoring for Critical Water Infrastructure Upgrade - 321 Heart Lake Road South – Brampton, ON... Read More

excavation; shoring

Adelaide St. N. Underpass

Caisson and Soldier Pile Excavation Support Design for Rail Underpass Construction: Central Avenue & Adelaide St. North – London, ON...Read More

excavation; shoring; subway; ttc; design

TTC Donlands Subway Station

Excavation Shoring for Second Entrance and Elevator Installation
Donlands TTC Station – Toronto, ON... Read More

5250 Yonge Street

Excavation Shoring and Monitoring Adjacent to TTC Subway Infrastructure
5250 Yonge Street – Toronto, ON... Read More

939 Eglinton Ave East - Upper East Village Condos

Urban Excavation Shoring & Monitoring Adjacent to Critical Transit Infrastructure
939 Eglinton Avenue East – Toronto, ON... Read More

Regent Park Block 17S

Urban Excavation Shoring & Monitoring for High-Rise Residential Tower
Northwest Corner of Dundas Street East & River Street – Toronto, ON... Read More

sheet piles; excavation; shoring

HIGHWAY 401 and raisin river

Cofferdam Shoring for Bridge Replacement Over Active Watercourse
Intersection of Highway 401 & Raisin River – South Glengarry, ON... Read More