Toronto Western Hospital
a 15-storey patient tower accompanied by two levels of basement.
This expansion, expected to be completed in 2028, responds to the growing healthcare needs and aims to extend care to over 450,000 annual visitors.
Southeast corner of Bathurst Street & Nassau Street, Toronto
August 2023 to Present
EllisDon Corporation
Total Number of Piles: 119
Services Provided
As part of a major healthcare infrastructure upgrade, Toronto Western Hospital is constructing a new 15-storey patient tower with two levels of underground space. InGeo Design was onboarded by EllisDon Corporation to provide comprehensive GeoStructural design services for excavation support at the southeast corner of Bathurst Street and Nassau Street. This addition will expand the hospital’s capacity to serve over 450,000 patients annually and is scheduled for completion in 2028.
With an estimated excavation shoring cost of less than $2 million and a total linear shoring length of 237 meters, this urban project presented several design and logistical challenges. InGeo Design responded with tailored solutions delivered through quick turnaround and direct access to experienced engineers.
Key Challenges
- Designing safe and compliant excavation systems adjacent to active TTC streetcar tracks
- Navigating overhead hydro lines and confined vertical clearance along the west face
- Meeting City of Toronto and TTC monitoring requirements
- Addressing structural sensitivities of the existing hospital
- Delivering designs within tight scheduling windows
InGeo’s Role & Scope
1. Design of multiple excavation support systems, tailored to site-specific conditions:
- Soldier pile and lagging
- Caisson walls with tiebacks
- Shotcrete and soil nail systems for confined and overhead-restricted areas
2. Pre-construction condition surveys, covering:
- Hospital exterior façade
- Adjacent church structure
- Sidewalks, public streets, and hardscapes
3. Multiple shoring options provided to accommodate staging, access limitations, and hydro line constraints.
4. Planned construction-phase monitoring services, including:
- Precision target monitoring
- Inclinometer and pile movement tracking
- Continuous settlement and vibration monitoring per City of Toronto standards
More Projects

Union Station
Complex Excavation Support & Tunnel Rehabilitation:
Front Street Corridor – Toronto, ON... Read More

Royal Canadian Yacht Club Seawall
Seawall and Boat Lift Replacement for Expanded Marine Access
Royal Canadian Yacht Club – Toronto Islands, Toronto, ON... Read More

Essa Road Expansion
Excavation Shoring for Interchange Reconstruction and Bridge Replacement
Highway 400 & Essa Road – Barrie, ON... Read More

Highway 407 Expansion Over Wilcot Creek
Excavation Shoring for Bridge Construction on Major Highway Expansion
Highway 407 at Wilcot Creek – Clarington, ON... Read More

West Portal - Eglinton Crosstown LRT
Excavation Shoring & Monitoring for Major Transit Infrastructure
Eglinton Avenue West – West of Black Creek Drive, Toronto, ON... Read More

Dundas And Aukland Condominium
Urban Excavation Shoring & Monitoring for High-Rise Mixed-Use Tower
5249 Dundas Street West – Etobicoke, ON... Read More

2175 Keele Street Phase II
Excavation Shoring & Monitoring for Large-Scale Mid-Rise Residential Development
2175 Keele Street – Toronto, ON...Read More

Queen & Ontario Condominium
261–285 Queen St. E., 90 Ontario St. & 384–410 Richmond St. E. – Toronto, ON... Read More

Toronto Western Hospital
Excavation & Monitoring Support Design for Hospital Expansion: Bathurst Street & Nassau Street – Toronto, ON... Read More

Catharine Street Pedestrian Bridge
Specialized Foundation Design & Load Testing for Municipal Bridge Replacement
1 Catharine Street, Belleville, ON... Read More

Dofasco Steel Plant Micropiles
Micropile Design & Testing for Major Industrial Expansion
1330 Burlington Street East – Hamilton, ON... Read More

900 St. Clair Avenue West
Urban Excavation Shoring & Monitoring for Mixed-Use Development
898–900 St. Clair Avenue West, Toronto, ON... Read More

Beckett Sproule Pumping Station
Shoring Design and Monitoring for Critical Water Infrastructure Upgrade - 321 Heart Lake Road South – Brampton, ON... Read More

Adelaide St. N. Underpass
Caisson and Soldier Pile Excavation Support Design for Rail Underpass Construction: Central Avenue & Adelaide St. North – London, ON...Read More

TTC Donlands Subway Station
Donlands TTC Station – Toronto, ON... Read More

5250 Yonge Street
Excavation Shoring and Monitoring Adjacent to TTC Subway Infrastructure
5250 Yonge Street – Toronto, ON... Read More

939 Eglinton Ave East - Upper East Village Condos
Urban Excavation Shoring & Monitoring Adjacent to Critical Transit Infrastructure
939 Eglinton Avenue East – Toronto, ON... Read More

Regent Park Block 17S
Urban Excavation Shoring & Monitoring for High-Rise Residential Tower
Northwest Corner of Dundas Street East & River Street – Toronto, ON... Read More

HIGHWAY 401 and raisin river
Cofferdam Shoring for Bridge Replacement Over Active Watercourse
Intersection of Highway 401 & Raisin River – South Glengarry, ON... Read More