call us at 416.481.3030 info@ingeodesign.com

Regent Park Block 17S

Regent Park Revitalization program, Block 17S is a high-rise residential development with 33 storeys and 3 levels of underground parking.

Location:
Dundas Street East and River Street. Toronto, Ontario

Duration:
December 2018 to January 2020

Shoring Contractor:
Rumble Foundations

Services Provided

InGeo Design provided excavation shoring and monitoring solutions for Regent Park, Block 17S, a 33-storey high-rise residential tower with a three-level underground parking facility. Developed by Daniels Corporation, this project is part of the broader revitalization of Regent Park, a landmark redevelopment initiative in Toronto focused on transforming aging infrastructure into a vibrant, mixed-income, mixed-use urban community.

Located along the active Dundas and River intersection, the project required excavation adjacent to public infrastructure, including TTC streetcar tracks, and existing residential and commercial structures. InGeo’s timely and construction-ready shoring design, along with our complete monitoring program, played a critical role in managing risk and ensuring a smooth excavation phase.

Drawing on extensive experience with urban sites and offering direct access to senior engineers, InGeo responded quickly to shifting site needs while maintaining technical clarity and adherence to City requirements.

Key Challenges

  • Deep excavation supported by tiebacks avoiding other previously installed sharing systems and caissons from neighbouring projects
  • Proximity to TTC streetcar infrastructure and adjacent buildings

InGeo’s Role & Scope

  • Design of shoring system including soldier piles and lagging with two rows of tiebacks
  • Field reviews to verify design compliance and allow for site adjustments
  • Pre-construction condition surveys of surrounding properties, including TTC streetcar lines and nearby structures
  • Full excavation monitoring suite, including:
    1. Pile target monitoring to assess movement of shoring elements
    2. Precision monitoring of ground and structural displacement
    3. Vibration monitoring during excavation activities to safeguard infrastructure and buildings
  • Ongoing collaboration with site teams and consultants, facilitated by direct access to InGeo’s senior engineers

More Projects

Union Station

Complex Excavation Support & Tunnel Rehabilitation:
Front Street Corridor – Toronto, ON... Read More

seawall; sheet piles; shoring; toronto islands

Royal Canadian Yacht Club Seawall

Seawall and Boat Lift Replacement for Expanded Marine Access
Royal Canadian Yacht Club – Toronto Islands, Toronto, ON... Read More

excavation; shoring; design; highway

Essa Road Expansion

Excavation Shoring for Interchange Reconstruction and Bridge Replacement
Highway 400 & Essa Road – Barrie, ON... Read More

Highway 407 Expansion Over Wilcot Creek

Excavation Shoring for Bridge Construction on Major Highway Expansion
Highway 407 at Wilcot Creek – Clarington, ON... Read More

West Portal - Eglinton Crosstown LRT

Excavation Shoring & Monitoring for Major Transit Infrastructure
Eglinton Avenue West – West of Black Creek Drive, Toronto, ON... Read More

Dundas And Aukland Condominium

Urban Excavation Shoring & Monitoring for High-Rise Mixed-Use Tower
5249 Dundas Street West – Etobicoke, ON... Read More

2175 Keele Street Phase II

Excavation Shoring & Monitoring for Large-Scale Mid-Rise Residential Development
2175 Keele Street – Toronto, ON...Read More

Excavation; Shoring; Design

Queen & Ontario Condominium

Excavation Shoring for Mixed-Use Towers with Heritage Sensitivity
261–285 Queen St. E., 90 Ontario St. & 384–410 Richmond St. E. – Toronto, ON... Read More
Excavation; Shoring

Toronto Western Hospital

Excavation & Monitoring Support Design for Hospital Expansion: Bathurst Street & Nassau Street – Toronto, ON... Read More

excavation; micropiles; bridge; shoring; design

Catharine Street Pedestrian Bridge

Specialized Foundation Design & Load Testing for Municipal Bridge Replacement
1 Catharine Street, Belleville, ON... Read More

Dofasco Steel Plant Micropiles

Micropile Design & Testing for Major Industrial Expansion
1330 Burlington Street East – Hamilton, ON... Read More

shoring, excavation

900 St. Clair Avenue West

Urban Excavation Shoring & Monitoring for Mixed-Use Development
898–900 St. Clair Avenue West, Toronto, ON... Read More

excavation; shoring; design; support

Beckett Sproule Pumping Station

Shoring Design and Monitoring for Critical Water Infrastructure Upgrade - 321 Heart Lake Road South – Brampton, ON... Read More

excavation; shoring

Adelaide St. N. Underpass

Caisson and Soldier Pile Excavation Support Design for Rail Underpass Construction: Central Avenue & Adelaide St. North – London, ON...Read More

excavation; shoring; subway; ttc; design

TTC Donlands Subway Station

Excavation Shoring for Second Entrance and Elevator Installation
Donlands TTC Station – Toronto, ON... Read More

5250 Yonge Street

Excavation Shoring and Monitoring Adjacent to TTC Subway Infrastructure
5250 Yonge Street – Toronto, ON... Read More

939 Eglinton Ave East - Upper East Village Condos

Urban Excavation Shoring & Monitoring Adjacent to Critical Transit Infrastructure
939 Eglinton Avenue East – Toronto, ON... Read More

Regent Park Block 17S

Urban Excavation Shoring & Monitoring for High-Rise Residential Tower
Northwest Corner of Dundas Street East & River Street – Toronto, ON... Read More

sheet piles; excavation; shoring

HIGHWAY 401 and raisin river

Cofferdam Shoring for Bridge Replacement Over Active Watercourse
Intersection of Highway 401 & Raisin River – South Glengarry, ON... Read More