Union Station Revitalization

Union Station is the premier gateway to Toronto and the busiest, most important multimodal passenger transportation hub in Canada, serving a quarter-million people daily. In order to improve the quality and capacity for pedestrians, this multi-stage revitalization project involves the construction of underground TTC platform extensions, as well as the development of new transit and pedestrian concourses.

Location:
Union Station, 55 Front Street, Toronto, Ontario

Duration:
2011 to 2015

Shoring Contractor:
Belor Construction – Earthline Foundations

Services Provided

This five-year project involved the underground excavation of sections along Front St., from Bay to York Streets. We have worked closely with the General Contractor, Ellis Don, structural engineers and shoring contractor to provide solutions during various construction activities. Our role in this project included many different aspects, such as:

  • Structural finite element analysis of the TTC tunnel during different stages of excavation
  • Lateral bracing using software SAP
  • Design of temporary supports during rehabilitation of the TTC tunnel
  • Design of excavation support systems including: soldier pile and lagging, caisson wall and shotcrete with supports including tiebacks, struts, rakers and corner braces
  • Site presence during tieback stressing, column loading, flat jack loading, pre-stressing of utility supports, pre-loading of rakers and struts and general field review
  • Design of traffic decking for the intersection at Bay and Front Streets.
  • Analysis of the TTC tunnel structure overlying different loading, including mobile cranes and construction equipment loading
  • Design of utility supports including water mains, hydro duct banks, sewers, telecommunication cables and gas mains
  • Adjusting supports to suit variability of site conditions
  • Working closely with construction team to solve various difficulties during construction activities.

 ***InGeo Design was a subcontractor to temporary works engineering consulting company.

More Projects

Union Station Revitalization

Union Station is the premier gateway to Toronto and the busiest, most important multimodal passenger transportation hub in Canada; serving a quarter-million people daily… Read More

Highway 407 Expansion

The Highway 407 expansion included 14m-wide bridges for the eastbound and westbound lanes over Wilmot Creek to allow the creek to flow below it. The bridge foundation… Read More

Eglinton LRT - West Portal

The Eglinton Crosstown Light Rail Transit (LRT) is a 19km project running east-west across Toronto. It has 25 stations and stops and connects to 54 bus routes, 3 TTC subway stations… Read More

Dundas And Aukland Condominium

Located at the south east corner of Dundas and Aukland, this condo is a 40-storey building consisting of 376 residential units… Read More

2175 Keele Street Phase II

Phase II of a two-phase project consists of 8 buildings on site ranging from 3 to 6 storeys, and a combination of mid-rise buildings and stacked townhouses. An underground… Read More

One Eleven Bathurst Condominium

Located at the intersection of Bathurst and Adelaide, One Eleven Bathurst is a 17-storey building comprising 256 residential… Read More

Regent Park - Block 26

Regent Park Revitalization program, Block 26 is a high-rise residential development with 26 storeys and 2 levels of underground parking. The excavation shoring design… Read More

Dofasco Micropiles

An extension was designed for the expansion of the Dofasco Boiler House, north of the existing building. InGeo designed a system of micropiles, extending to rock, for the… Read More

County Road 2/34

Excavation shoring support required for highway bridge replacement. InGeo designed the excavation shoring at existing north and south abutments of the bridge, to support… Read More

shoring, excavation

900 St. Clair Avenue West

Located on the northeast corner of St. Clair Ave W and Alberta Ave, 900 St. Clair is a 12-storey building comprised of commercial units on the ground floor and residential… Read More

Highway 427 Expansion

The expansion of highway 427 consists of installing new footings for the bridge, which runs over a CN railway. InGeo designed excavation support for footing excavation near… Read More

5250 Yonge Street

5250 Yonge is a high-rise development for office and retail space in North York with 31 storeys and 4 levels of underground parking. The site is bounded by Yonge Street to the… Read More

939 Eglinton Ave East - Upper East Village Condos

The Upper East Village Condominiums consists of 21-storey and 18-storey mixed-used developments, with four levels of… Read More

Regent Park Block 17S

Regent Park Revitalization program, Block 17S is a high-rise residential development with 33 storeys and 3 levels of underground parking. InGeo Design provided excavation… Read More

sheet piles; excavation; shoring

HIGHWAY 401 and raisin river

Located in the township of South Glengarry, Highway 401 bridge over Raisin River and County Road 2/34 Bridge were replaced… Read More