Highway 407 Over Wilcot Creek

The Highway 407 expansion consists of 14m-wide bridges for the eastbound and westbound lanes, allowing Wilmot Creek to flow around. The bridge foundation includes perched concrete wall abutments supported on steel H-pile foundations.

Location:
Highway 407 at Leskard Rd, over Wilmot Creek, Clarington, Ontario

Duration:
Summer 2017

Shoring Contractor:
Bermingham Foundations

Services Provided

InGeo Design was retained by Soletanche Bachy Canada to provide excavation shoring design and field support for a key component of the Highway 407 East Phase 2 expansion. The overall project extended Highway 407 by approximately 22 kilometers from Harmony Road in Oshawa to Highway 35/115 in Clarington, and included the construction of Highway 418; a new north-south connector between Highways 401 and 407.

As part of the bridge construction over Wilcot Creek, InGeo designed a sheet pile shoring system with internal walers and corner braces to support excavation activities. The design was tailored to meet site-specific geotechnical conditions and construction sequencing requirements.

Key Challenges

  • Supporting excavation for bridge construction over an active watercourse
  • Coordination within a fast-paced provincial highway expansion project
  • Ensuring compliance with design standards and site-specific conditions

InGeo’s Role & Scope

  • Design of sheet pile cofferdam supported by internal walers and corner braces
  • Collaboration with Soletanche Bachy Canada to align design with construction needs
  • Field reviews during installation to verify compliance

    More Projects

    Union Station

    Complex Excavation Support & Tunnel Rehabilitation:
    Front Street Corridor – Toronto, ON... Read More

    seawall; sheet piles; shoring; toronto islands

    Royal Canadian Yacht Club Seawall

    Seawall and Boat Lift Replacement for Expanded Marine Access
    Royal Canadian Yacht Club – Toronto Islands, Toronto, ON... Read More

    excavation; shoring; design; highway

    Essa Road Expansion

    Excavation Shoring for Interchange Reconstruction and Bridge Replacement
    Highway 400 & Essa Road – Barrie, ON... Read More

    Highway 407 Expansion Over Wilcot Creek

    Excavation Shoring for Bridge Construction on Major Highway Expansion
    Highway 407 at Wilcot Creek – Clarington, ON... Read More

    West Portal - Eglinton Crosstown LRT

    Excavation Shoring & Monitoring for Major Transit Infrastructure
    Eglinton Avenue West – West of Black Creek Drive, Toronto, ON... Read More

    Dundas And Aukland Condominium

    Urban Excavation Shoring & Monitoring for High-Rise Mixed-Use Tower
    5249 Dundas Street West – Etobicoke, ON... Read More

    2175 Keele Street Phase II

    Excavation Shoring & Monitoring for Large-Scale Mid-Rise Residential Development
    2175 Keele Street – Toronto, ON...Read More

    Excavation; Shoring; Design

    Queen & Ontario Condominium

    Excavation Shoring for Mixed-Use Towers with Heritage Sensitivity
    261–285 Queen St. E., 90 Ontario St. & 384–410 Richmond St. E. – Toronto, ON... Read More
    Excavation; Shoring

    Toronto Western Hospital

    Excavation & Monitoring Support Design for Hospital Expansion: Bathurst Street & Nassau Street – Toronto, ON... Read More

    excavation; micropiles; bridge; shoring; design

    Catharine Street Pedestrian Bridge

    Specialized Foundation Design & Load Testing for Municipal Bridge Replacement
    1 Catharine Street, Belleville, ON... Read More

    Dofasco Steel Plant Micropiles

    Micropile Design & Testing for Major Industrial Expansion
    1330 Burlington Street East – Hamilton, ON... Read More

    shoring, excavation

    900 St. Clair Avenue West

    Urban Excavation Shoring & Monitoring for Mixed-Use Development
    898–900 St. Clair Avenue West, Toronto, ON... Read More

    excavation; shoring; design; support

    Beckett Sproule Pumping Station

    Shoring Design and Monitoring for Critical Water Infrastructure Upgrade - 321 Heart Lake Road South – Brampton, ON... Read More

    excavation; shoring

    Adelaide St. N. Underpass

    Caisson and Soldier Pile Excavation Support Design for Rail Underpass Construction: Central Avenue & Adelaide St. North – London, ON...Read More

    excavation; shoring; subway; ttc; design

    TTC Donlands Subway Station

    Excavation Shoring for Second Entrance and Elevator Installation
    Donlands TTC Station – Toronto, ON... Read More

    5250 Yonge Street

    Excavation Shoring and Monitoring Adjacent to TTC Subway Infrastructure
    5250 Yonge Street – Toronto, ON... Read More

    939 Eglinton Ave East - Upper East Village Condos

    Urban Excavation Shoring & Monitoring Adjacent to Critical Transit Infrastructure
    939 Eglinton Avenue East – Toronto, ON... Read More

    Regent Park Block 17S

    Urban Excavation Shoring & Monitoring for High-Rise Residential Tower
    Northwest Corner of Dundas Street East & River Street – Toronto, ON... Read More

    sheet piles; excavation; shoring

    HIGHWAY 401 and raisin river

    Cofferdam Shoring for Bridge Replacement Over Active Watercourse
    Intersection of Highway 401 & Raisin River – South Glengarry, ON... Read More