call us at 416.481.3030 [email protected]

Adelaide St. N.

Underpass

Adelaide Street North had four lanes of at-grade traffic across the Canadian Pacific Railway tracks. An underpass for the train tracks was underway to help alleviate traffic delays due to the closure of Adelaide Street North while the trains cross this street.

Location:
Central Avenue & Adelaide St. North, London, ON

Duration:
May 2022 to Summer of 2023

Shoring Contractor:
Bauer Foundations Canada

Total Shoring Linear Length: 339 meters

Total Number of Piles: 179

Services Provided

InGeo Design team worked with Bauer Foundations Canada and designed a caisson and soldier pile lagging system to support the active CN train tracks. A temporary bridge bear on the caisson wall systems to temporarily support the tracks prior to building the permanent abutment walls. This system consisted of two levels of struts/ tiebacks. A shaft with an 11m diameter and 13.5m depth with mainly caisson wall was designed for this project too.

We also designed a permanent caisson wall to act as a soil support system adjacent to the proposed sidewalk. Our team conducted regular site visits to verify that the overall construction adhered to the specified design parameters.

excavation; shoring; shaft; design

More Projects

Union Station Revitalization

Union Station is the premier gateway to Toronto and the busiest, most important multimodal passenger transportation hub in Canada; serving a quarter-million people daily… Read More

seawall; sheet piles; shoring; toronto islands

Royal Canadian Yacht Club Seawall

Located on the Toronto Islands, Royal Canadian Yacht Club (RCYC) embarked on a development project to enhance its seawall and boat lift area… Read More

excavation; shoring; design; highway

Essa Road Expansion

As part of the extensive reconstruction efforts aimed at enhancing traffic flow and safety, the Highway 400 and Essa Road interchange underwent significant improvements… Read More

Highway 407 Expansion

The Highway 407 expansion included 14m-wide bridges for the eastbound and westbound lanes over Wilmot Creek to allow the creek to flow below it. The bridge foundation… Read More

Eglinton LRT - West Portal

The Eglinton Crosstown Light Rail Transit (LRT) is a 19km project running east-west across Toronto. It has 25 stations and stops and connects to 54 bus routes, 3 TTC subway stations… Read More

Dundas And Aukland Condominium

Located at the south east corner of Dundas and Aukland, this condo is a 40-storey building consisting of 376 residential units… Read More

2175 Keele Street Phase II

Phase II of a two-phase project consists of 8 buildings on site ranging from 3 to 6 storeys, and a combination of mid-rise buildings and stacked townhouses. An underground… Read More

Excavation; Shoring; Design

Queen & Ontario Condominium

Situated at the southwest corner of Queen Street East and Ontario Street, and the northwest corner of Richmond Street East and Ontario Street, this vibrant mixed-use development features… Read More

Excavation; Shoring

Toronto Western Hospital

Toronto Western Hospital is constructing a significant addition — a 15-storey patient tower accompanied by two levels of basement. This expansion … Read More

excavation; shoring; design; support

Beckett Sproule Pumping Station

The Beckett Sproule Pumping Station Upgrade project marks a significant milestone in enhancing water infrastructure efficiency and reliability… Read More

excavation; micropiles; bridge; shoring; design

Catharine Street Pedestrian Bridge

The Catharine Street Pedestrian Bridge, spanning the Moira River near downtown Belleville, required replacement… Read More

Dofasco Micropiles

An extension was designed for the expansion of the Dofasco Boiler House, north of the existing building. InGeo designed a system of micropiles, extending to rock, for the… Read More

County Road 2/34

Excavation shoring support required for highway bridge replacement. InGeo designed the excavation shoring at existing north and south abutments of the bridge, to support… Read More

shoring, excavation

900 St. Clair Avenue West

Located on the northeast corner of St. Clair Ave W and Alberta Ave, 900 St. Clair is a 12-storey building comprised of commercial units on the ground floor and residential… Read More

excavation; shoring

Adelaide St. N. Underpass

Adelaide Street North has four lanes of at-grade traffic across the Canadian Pacific Railway tracks. An underpass … Read More

excavation; shoring; subway; ttc; design

TTC Donlands Subway Station

Enhancing customer safety and easier access to wheel chairs, the Donlands TTC Subway Station had a transformative journey… Read More

5250 Yonge Street

5250 Yonge is a high-rise development for office and retail space in North York with 31 storeys and 4 levels of underground parking. The site is bounded by Yonge Street to the… Read More

939 Eglinton Ave East - Upper East Village Condos

The Upper East Village Condominiums consists of 21-storey and 18-storey mixed-used developments, with four levels of… Read More

Regent Park Block 17S

Regent Park Revitalization program, Block 17S is a high-rise residential development with 33 storeys and 3 levels of underground parking. InGeo Design provided excavation… Read More

sheet piles; excavation; shoring

HIGHWAY 401 and raisin river

Located in the township of South Glengarry, Highway 401 bridge over Raisin River and County Road 2/34 Bridge were replaced… Read More