call us at 416.481.3030 info@ingeodesign.com

900 St. Clair Avenue West

Located on the northeast corner of St. Clair Ave W and Alberta Ave, 900 St. Clair is a 12-storey building comprised of commercial units on the ground floor and residential units on 11 floors. It has 3 levels of underground parking.

Location:
St. Clair Avenue West and Alberta Avenue. Toronto, Ontario

Duration:
Shoring Installation began May 2020

Shoring Contractor:
Shor Cais Foundation Contractors

Services Provided

InGeo Design provided critical excavation shoring and monitoring solutions for this 12-storey mixed-use residential and commercial development by Canderel Group, located at the northeast corner of St. Clair Avenue West and Alberta Avenue in Toronto. With two levels of underground parking and a constrained urban footprint, this project demanded precise engineering, fast decision-making, and seamless collaboration across disciplines.

Leveraging our diverse project experience and offering direct access to senior engineers, InGeo delivered shoring designs with rapid turnaround. Our role extended beyond design, incorporating strong monitoring programs and detailed pre-construction assessments to mitigate risk and protect adjacent structures.

Key Challenges

  • Excavation support for two deep basement levels in a tight, urban site
  • Encroachment was restricted on two sides of the excavation site
  • Delivering responsive engineering solutions under an accelerated timeline

InGeo’s Role & Scope

  • Fast-tracked design of excavation shoring systems, including soldier piles and lagging, and caisson walls
  • Design of lateral supports such as tiebacks, rakers, and corner braces to ensure excavation stability and deal with no encroachment on two sides of the excavation
  • Pre-construction condition surveys of surrounding properties to assess and manage risk
  • Full monitoring services, including: Pile and precision monitoring, Inclinometer installation and tracking of ground movement, Vibration monitoring and Crack gauge monitoring
  • Flexible design modifications to address changing site conditions
shoring, excavation

More Projects

Union Station

Complex Excavation Support & Tunnel Rehabilitation:
Front Street Corridor – Toronto, ON... Read More

seawall; sheet piles; shoring; toronto islands

Royal Canadian Yacht Club Seawall

Seawall and Boat Lift Replacement for Expanded Marine Access
Royal Canadian Yacht Club – Toronto Islands, Toronto, ON... Read More

excavation; shoring; design; highway

Essa Road Expansion

Excavation Shoring for Interchange Reconstruction and Bridge Replacement
Highway 400 & Essa Road – Barrie, ON... Read More

Highway 407 Expansion Over Wilcot Creek

Excavation Shoring for Bridge Construction on Major Highway Expansion
Highway 407 at Wilcot Creek – Clarington, ON... Read More

West Portal - Eglinton Crosstown LRT

Excavation Shoring & Monitoring for Major Transit Infrastructure
Eglinton Avenue West – West of Black Creek Drive, Toronto, ON... Read More

Dundas And Aukland Condominium

Urban Excavation Shoring & Monitoring for High-Rise Mixed-Use Tower
5249 Dundas Street West – Etobicoke, ON... Read More

2175 Keele Street Phase II

Excavation Shoring & Monitoring for Large-Scale Mid-Rise Residential Development
2175 Keele Street – Toronto, ON...Read More

Excavation; Shoring; Design

Queen & Ontario Condominium

Excavation Shoring for Mixed-Use Towers with Heritage Sensitivity
261–285 Queen St. E., 90 Ontario St. & 384–410 Richmond St. E. – Toronto, ON... Read More
Excavation; Shoring

Toronto Western Hospital

Excavation & Monitoring Support Design for Hospital Expansion: Bathurst Street & Nassau Street – Toronto, ON... Read More

excavation; micropiles; bridge; shoring; design

Catharine Street Pedestrian Bridge

Specialized Foundation Design & Load Testing for Municipal Bridge Replacement
1 Catharine Street, Belleville, ON... Read More

Dofasco Steel Plant Micropiles

Micropile Design & Testing for Major Industrial Expansion
1330 Burlington Street East – Hamilton, ON... Read More

shoring, excavation

900 St. Clair Avenue West

Urban Excavation Shoring & Monitoring for Mixed-Use Development
898–900 St. Clair Avenue West, Toronto, ON... Read More

excavation; shoring; design; support

Beckett Sproule Pumping Station

Shoring Design and Monitoring for Critical Water Infrastructure Upgrade - 321 Heart Lake Road South – Brampton, ON... Read More

excavation; shoring

Adelaide St. N. Underpass

Caisson and Soldier Pile Excavation Support Design for Rail Underpass Construction: Central Avenue & Adelaide St. North – London, ON...Read More

excavation; shoring; subway; ttc; design

TTC Donlands Subway Station

Excavation Shoring for Second Entrance and Elevator Installation
Donlands TTC Station – Toronto, ON... Read More

5250 Yonge Street

Excavation Shoring and Monitoring Adjacent to TTC Subway Infrastructure
5250 Yonge Street – Toronto, ON... Read More

939 Eglinton Ave East - Upper East Village Condos

Urban Excavation Shoring & Monitoring Adjacent to Critical Transit Infrastructure
939 Eglinton Avenue East – Toronto, ON... Read More

Regent Park Block 17S

Urban Excavation Shoring & Monitoring for High-Rise Residential Tower
Northwest Corner of Dundas Street East & River Street – Toronto, ON... Read More

sheet piles; excavation; shoring

HIGHWAY 401 and raisin river

Cofferdam Shoring for Bridge Replacement Over Active Watercourse
Intersection of Highway 401 & Raisin River – South Glengarry, ON... Read More